Switches

Items 145-180 of 294 total

Set Descending Direction
  1. Switch, Pressure, Low, Open-7, Close-22 Switch, Pressure, Low, Open-7, Close-22
    Add to Favorite List Add to Project
  2. Switch Pressure 0.90 2 Stage High-Fire Switch Pressure 0.90 2 Stage High-Fire
    Add to Favorite List Add to Project
  3. Switch Pressure 0.85 Switch Pressure 0.85
    Add to Favorite List Add to Project
  4. Control, Pres, Refrig, 380/300(O/C) Psig Control, Pres, Refrig, 380/300(O/C) Psig
    Add to Favorite List Add to Project
  5. Control, Temp, 150 Open, 100, Close Control, Temp, 150 Open, 100, Close
    Add to Favorite List Add to Project
  6. Control, Temp, 170 Open, 110 Close, Spdt Control, Temp, 170 Open, 110 Close, Spdt
    Add to Favorite List Add to Project
  7. Control, Rollout, 145 Open, 105 Close, Spst Control, Rollout, 145 Open, 105 Close, Spst
    Add to Favorite List Add to Project
  8. Control, Rollout, 160 Open, 120 Close, Spst Control, Rollout, 160 Open, 120 Close, Spst
    Add to Favorite List Add to Project
  9. Control, Temp, 26 Open, 45 Close, Spst Control, Temp, 26 Open, 45 Close, Spst
    Add to Favorite List Add to Project
  10. Control, Temp, 370 Open, Manual Close Control, Temp, 370 Open, Manual Close
    Add to Favorite List Add to Project
  11. Switch, Limit Auxiliary, 170 Manual Switch, Limit Auxiliary, 170 Manual
    Add to Favorite List Add to Project
  12. Cntrl, Rollout, 200 Open, Manual Reset Cntrl, Rollout, 200 Open, Manual Reset
    Add to Favorite List Add to Project
  13. Switch, Limit, 185/155 (O/C), Auto Reset Switch, Limit, 185/155 (O/C), Auto Reset
    Add to Favorite List Add to Project
  14. Control, Pres, Refrig, High, 400/300(O/C) Psig Control, Pres, Refrig, High, 400/300(O/C) Psig
    Add to Favorite List Add to Project
  15. Control, Pres, Refrig, 50/71 (O/C) PSIG Control, Pres, Refrig, 50/71 (O/C) PSIG
    Add to Favorite List Add to Project
  16. Switch, Pres, Blocked Drain, 0.65 Iwc Duc Switch, Pres, Blocked Drain, 0.65 Iwc Duc
    Add to Favorite List Add to Project
  17. Control,VAV,CONFIG,STG,INC,SCR BOX HTG Control,VAV,CONFIG,STG,INC,SCR BOX HTG
    Add to Favorite List Add to Project
  18. Switch, Furnace Door Switch, Furnace Door
    Add to Favorite List Add to Project
  19. Control, Temp, 180 Open, Manual Reset Control, Temp, 180 Open, Manual Reset
    Add to Favorite List Add to Project
  20. Pressure Switch 0.80 X .4 Pressure Switch 0.80 X .4
    Add to Favorite List Add to Project
  21. Switch, Pres, Air, 1.00 On Fall, Spno Switch, Pres, Air, 1.00 On Fall, Spno
    Add to Favorite List Add to Project
  22. Switch, Pres, Air, -0.90 On Fall, Spno Switch, Pres, Air, -0.90 On Fall, Spno
    Add to Favorite List Add to Project
  23. Control, Limit, 60Tx11 (O-150, C-120) Open Control, Limit, 60Tx11 (O-150, C-120) Open
    Add to Favorite List Add to Project
  24. Transducer Press 0-10Vdouble-Click -1 To 1 In Wc Transducer Press 0-10Vdouble-Click -1 To 1 In Wc
    Add to Favorite List Add to Project
  25. Switch Limit 235/205 O/C Auto Reset Switch Limit 235/205 O/C Auto Reset
    Add to Favorite List Add to Project
  26. Control, Temp, 55 Open, 31 Close, Spst Defrost Control, Temp, 55 Open, 31 Close, Spst Defrost
    Add to Favorite List Add to Project
  27. Control, Temp, 55 Open, 45 Close Spst Harness Control, Temp, 55 Open, 45 Close Spst Harness
    Add to Favorite List Add to Project
  28. Sw, Limit, 160Deg F Open/140Deg F Cls, Auto Sw, Limit, 160Deg F Open/140Deg F Cls, Auto
    Add to Favorite List Add to Project
  29. Control, Temp, 80 Open, 31 Close, Spst Control, Temp, 80 Open, 31 Close, Spst
    Add to Favorite List Add to Project
  30. SWITCH DISCONNECT 3 POLE 250A 600V SWITCH DISCONNECT 3 POLE 250A 600V
    Add to Favorite List Add to Project
  31. Switch Pressure 0.20 Switch Pressure 0.20
    Add to Favorite List Add to Project
  32. Switch Aux Cntctr 3Pl Xm C0 10 600 Hongfa Switch Aux Cntctr 3Pl Xm C0 10 600 Hongfa
    Add to Favorite List Add to Project
  33. Control, Rollout, 225 Open, 145 Close, Spst Control, Rollout, 225 Open, 145 Close, Spst
    Add to Favorite List Add to Project
  34. Control, Temp, 26 Open, 38 Close, Spst Control, Temp, 26 Open, 38 Close, Spst
    Add to Favorite List Add to Project
  35. Control, Rollout, 175 Open, 95 Close, Dpst Control, Rollout, 175 Open, 95 Close, Dpst
    Add to Favorite List Add to Project
  36. Control, Rollout, 300, Open, 220 Close Control, Rollout, 300, Open, 220 Close
    Add to Favorite List Add to Project

Items 145-180 of 294 total

Set Descending Direction